Coal & Mineral | Marine | Cargo | Lloyd's Agency | Petroleum & Chemical | Palm Oil | Cotton | Oil & Gas | Lab | ISPS | Training | Collateral Management

   
 

COAL & MINERALS

A geological survey represents the starting point in determining the feasibility of any potential coal or mineral mine site. Geological survey that are based on sound and established survey standards and practices ensure that our client receive realistic and factual information that will provide them with the right information that ultimately will assist them in their investment decisions.
The trading of commodities on an international basis represents an important facet of today’s globalised company. Inspection and superintending services play a key role in ensuring that the financial and legal interests of both the buyer and seller to any commodity transaction are preserved.

1. A. Geological Survey for COAL

Stage 1 – General Survey Stage
Title search if required
Reconnaissance mapping
Outcrop sampling
Geological aspects (morphology, formations, stratigraphy, etc)
Distribution of coal bearing formations
Possible Transportation route survey
Sample Analysis
Quality Estimation
Resource / Quantity Evaluation and Estimation
Recommendation for next stage survey

Stage 2 – Exploration Stage - Semi Detail
Geological Mapping
Outcrop mapping
Stratigraphic Drilling / Scout Drilling
Geophysical logging
Trenching / Test Pit
Sample Analysis
Quality Estimation (seam by seam)
Resource / Quantity Evaluation and Estimation (indicated tonnages),
seam by seam
Recommendation for detailed drilling and resources / quality assessment
program

Stage 3 – Exploration Stage
- Detail
Geological mapping (detailed)
Topographic Mapping
Hydrology
Intensive Drilling (core and open hole chip, cropline)
Geophysical Logging
Sample Analysis
Resources / Quantity Evaluation and Estimation (measured, indicated,
inferred tonnages)
Seam by seam Analysis (Quality & Quantity)
Stripping ratio
Preparation of final exploration report and recommendation for future work


Stage 4 – Feasibility Study Stage
Mine Plan (assessment of proven and probable reserves tonnages, seam by
seam, stripping ratio)
Hauling Road Plan
Bathymetric / Hydrographic / Sounding Survey for Jetty Construction
Investment Plan
Financing Plan
Operational Costs Plan
Marketing Plan
Environmental Impact Analysis (AMDAL)

1. B Geological Survey for MINERALS

TitleLegalities for Concession
Geological Consulting
Geodetic Survey of Topographic, Mapping & Situation Survey
Management of Exploration and Evaluation Programs
(drilling, sampling, analysis)
Geotechnical & Mine Design Studies
Geophysics

JORC Competent Report
Carsurin has the capability of preparing JORC (Joint Ore Reserves Committee) compliant program reports to determine coal and mineral resources / reserves and quality.


 

 


NEWS & EVENTS

COAL SOCIETY GATHERING
Carsurin Britcham Coal Society
Gathering, Nov 2006
Coal Society Gathering, Feb 2007
Coal Society Gathering, May 2007
Coal & Mineral Society Gathering, Aug 2007
Marine & Insurance Society
Gathering
, Sep 2007
Carsurin Britcham Coal Society Gathering, July 2008

NEWS ARTICLE
Bisnis Indonesia (April 2007)
Business Week (May 2008)
Club Life (February-March 2007)
Club Life (May 2008)
The Report (Vol. 2 / 2007)
Eksekutif (May 2008)
Hospitality+ (Vol. 3 / 2008)
Investor (December 2007)
Kompas (November 2007)
Logistic+ (January 2007)
The Peak (Vol. 3 / 2008)
Sailings (February-March 2007)
Sailings (May 2007)
Sailings (May-June 2007)
Shipping Gazette (September 2007)
SWA (August 2008)
Majalah Tambang Online (November 2008)
Majalah Tambang (March 2007)
Majalah Tambang (May 2007)


 


2. PRODUCTION / MINING STAGE

• Coal preparation
• Quality control services
• Onsite / dedicated laboratory
• Stockpile managements
• Collateral managements

3. SHIPMENT STAGE

Pre-Shipment Inspection (PSI) at stockpile
Loading & Disharging Supervision
Quantity & Quality survey on Barge
Quantity & Quality survey on Vessel

Export Verification / Laporan Surveyor
In accordance with the new Indonesia Minister of Trade decree No. 384/M-DAG/KEP/6/2008, mandating that certain mine products such as coal and mineral exported out of Indonesia to have a LS Certificate


4. LABORATORY ANALYSIS

Coal-Full Analysis
Parameters :
Total Moisture
Proximate Analysis (Moisture, Ash Content, Volatile Matter, Fixed Carbon)
Calorifc Value
Ultimate Analysis (Carbon, Hydrogen, Nitrogen, Total Sulfur, Oxygen)
Form Of Sulfur (Total Sulfur, Pyritic Sulfur, Sulphate Sulfur, Organic Sulfur)
Hardgrove Grindability Index
Size Analysis
Chlorine
Trace Elements (Boron, Arsenic, Selenium, Fluorine, Mercury)
Phosphorous in Coal
Relative Density
Bulk Density
Ash Analysis (SiO2 , Al2O3 , Fe2O3 , CaO , MgO , K2O , Na2O , TiO2 , P2O5 , SO3 , Mn3O4)
Ash Fusion Temperature (Reducing, Oxidizing)


Minerals Analysis
Clay Mineral / Quartz Sand
Aurum Sand / Sulfides
Galena
Iron Ores, Sand
Lateritic Nickel
Limestone, Dolomite
Barium Carbonate
Zircon Sand, Stannum Ore
Manganese Ore
Bauxite
Gold
etc
Parameters :
• SiO2
• Al2O3
• As
• Au & Ag
• BaO
• CaO
• CaO Free
• CaO Total
• Co
• Cr2O3
• Cu
• Fe
• Fe Total
• Fe2O3
• H2O
• K2O

LOI
MgO
Mn
MnO
Na2O
Ni
P
P2O5
Pb
S
SiO2
SO3
TiO2
V
Zn
ZrO2
etc

Methodologies

• American Society for Testing and Material (ASTM)
• Internatioal Organization for
Standarization (ISO)
• Guojia Biaozhun (GB)
• Japanese Industrial Standard (JIS)
• Australian Standard (AS)
• British Standard Institution (BSI)

........................................................................................................................................................................................................

COMPANY | SERVICES | BRANCHES | CLIENTS | INDONESIA | CONTACT

 


Askrindo Building, 5th floor, Ph. +62(0)21 6540425, Fx. +62(0)21 6540418 / 30, Email. marketing@carsurin.com